Wind

The 10H wind law — how one regulation cost Poland billions

PiS introduced the 10H distance rule in 2016, effectively blocking onshore wind development. The cost: ~7 GW of clean energy not built, PLN 40-60 billion in higher electricity bills, and ~40 million tonnes of unnecessary CO2.

energy

Setting Up a Wind Turbine

A cheap wind turbine, a homemade braking system, and a November storm that changed how I think about control systems.

energy